DAA North Runway Construction Package 2

Client

Shannon Airport Authority

Location

Dublin Ireland

Duration

16 Months

Completion Date

Oct, 2020

Project Overview

Scope of Works:

  • Installation of Concrete Pipe drainage depths 3-5m
  • Installation of Runway drainage
  •  Installation of Filter Drainage for the Graded Strip Run-off Areas
  • Installation of Ducting and Boxes for Runway Lighting and Fibre Optic Cabling