The A465 Heads of the Valleys Dualling Abergavenny to Hirwaun

Subcontract Package Drainage Installation Package 3 Client FCC Construcción S.A. UK Branch Location A465 Heads of the Valleys Duration Circa 100 weeks Completion Date Summer 2024 Project Overview Scope of Works: 5 km of carrier drain, with diameters ranging from 225mm to 900mm 5 km of filter drain, with diameters ranging from 225mm to 600mm […]