DAA North Runway Construction Package 2

Client Shannon Airport Authority Location Dublin Ireland Duration 16 Months Completion Date Oct, 2020 Project Overview Scope of Works: Installation of Concrete Pipe drainage depths 3-5m Installation of Runway drainage Installation of Filter Drainage for the Graded Strip Run-off Areas Installation of Ducting and Boxes for Runway Lighting and Fibre Optic Cabling
The A465 Heads of the Valleys Dualling Abergavenny to Hirwaun

Subcontract Package Drainage Installation Package 3 Client FCC Construcción S.A. UK Branch Location A465 Heads of the Valleys Duration Circa 100 weeks Completion Date Summer 2024 Project Overview Scope of Works: 5 km of carrier drain, with diameters ranging from 225mm to 900mm 5 km of filter drain, with diameters ranging from 225mm to 600mm […]
Shannon Airport

Client Shannon Airport Authority Location Shannon Ireland Duration 8 Weeks Project Overview Scope of Works: Ducting Duct Chambers