Janssen Cork

Client Ringaskiddy, Co. Cork Location Ringaskiddy, Co. Cork Duration 5 Months Completion Date May, 2022 Project Overview Scope of Works: Excavation for Pad Foundations Ducting Preparation for Floor Slabs Drainage Compound Works

The A465 Heads of the Valleys Dualling Abergavenny to Hirwaun

Subcontract Package Drainage Installation Package 3 Client FCC Construcción S.A. UK Branch Location A465 Heads of the Valleys Duration Circa 100 weeks Completion Date Summer 2024 Project Overview Scope of Works: 5 km of carrier drain, with diameters ranging from 225mm to 900mm 5 km of filter drain, with diameters ranging from 225mm to 600mm […]

A361 North Devon Link Road

Subcontract Package Lankey Junction Drainage Installation Client Alun Griffiths (Contractors) Ltd. Location A361 North Devon Duration Circa 15 weeks Completion Date Winter 2022 Project Overview Scope of Works: The drainage element on the conversion of a 3-arm priority junction to a 4-arm roundabout. 7 km of carrier drain, with diameters ranging from 150mm to 600mm […]

Lyreen Meadows, Kilcock

Location Co. Kildare Duration 13 Months to date Project Overview Scope of Works: Site Development Infrastructure incl all services, paths and haul roads. Excavate, install drainage/ducting, install foundation Pad for 66 ICF units Bulk Excavation & removal of 10,000 cubic metres of Muck Excavate, install & backfill 650m3 attenuation tank Excavate, lay and test 1370 metres of mainline Storm and Foul drainage up […]

Claremont, Howth Rd

Subcontract Package Site Development Infrastructure (Plant, Labour & Material) Client Walls Construction Location Claremont, Howth Road, Co. Dublin, Ireland Duration Circa 52 weeks Completion Date Winter 2023 Subcontract Value Circa. € 3.1m Project Overview Scope of Works: Site Development Infrastructure incl all services, paths and haul roads. Crop & prep 650 piled pad foundations incl removal & […]

Centre for Future Learning, UCD Campus

Location Dublin Duration 5 Months to date Completion Date Jan 2024 Project Overview Complete civil works including demolition, drainage, ducting, and haul roads on a fully operational university campus. Scope of Works: Site Development Infrastructure incl all services, paths and haul roads. Demolition and removal of ex drainage system Bulk Excavation & removal of 20,000 […]

Bellmayne Residential Development

Location Sisk Duration 9 Months Completion Date May 2024 Project Overview Subcontract Scope: Site Development Infrastructure incl all services, paths and haul roads. Bulk excavation & removal off site Foundation prep and blinding. Stormwater and foul drainage system. Excavate, bed, lay, backfill and test 4,000m of pipework incl over 30 precast manholes. 3,3000 m of […]

ABBVIE Trinity BT Pharmaceutical Sligo

Client John Paul Construction Location Sligo Ireland Duration 6 Months Completion Date March 2019 Project Overview Scope of Works: Cofferdams Drainage Ducting

HS2 Project M6 Loop

Client PJ Hegarty & Sons Location HS2 Project M6 Loop Duration 30 Weeks Completion Date Jul, 2022 Project Overview Scope of Works: Drainage Ducting Watermain Slab Construction c500m2 series 700 (pavement) sub-base & 6f2

St Marnocks Bay

  Location Portmarnock, Ireland Duration 24 Months Completion Date Sept, 2022 Project Overview Scope: Full Groundworks Package for over 153 units Excavation of Roads Capping and Sub-base Installation of in-situ kerbs approx.6 km Blacktop to all road networks Base, Binder, and Wearing Course to complete road network Installation of all mainline foul and storm drainage […]