DAA North Runway Construction Package 2

  Client Shannon Airport Authority Location Dublin Ireland Duration 16 Months Completion Date Oct, 2020 Project Overview Scope of Works: Installation of Concrete Pipe drainage depths 3-5m Installation of Runway drainage  Installation of Filter Drainage for the Graded Strip Run-off Areas Installation of Ducting and Boxes for Runway Lighting and Fibre Optic Cabling