hartecivil

Civil

SEGRO Logistics Park Northampton Gateway

SEGRO Logistics Park Northampton Gateway Project Overview Scope of Works: headwalls chambers & catchpits (1050 -1500mm dia.), including Hydrobreaks and orifices plates gullies, including concrete

Civil

A361 North Devon Link Road

A361 North Devon Link Road Project Overview Scope of Works: The drainage element on the conversion of a 3-arm priority junction to a 4-arm roundabout.

Commercial

Lyreen Meadows, Kilcock

Lyreen Meadows, Kilcock Project Overview Scope of Works: Site Development Infrastructure incl all services, paths and haul roads. Excavate, install drainage/ducting, install foundation Pad for

Commercial

Claremont, Howth Rd

Claremont, Howth Rd Project Overview Scope of Works: Site Development Infrastructure incl all services, paths and haul roads. Crop & prep 650 piled pad foundations

Commercial

Centre for Future Learning, UCD Campus

Centre for Future Learning, UCD Campus, Project Overview Scope of Works: Site Development Infrastructure incl all services, paths and haul roads. Demolition and removal of

Residential

Bellmayne

Bellmayne Project Overview Scope of Works : Site Development Infrastructure incl all services, paths and haul roads. Bulk excavation & removal off site Foundation prep

Civil

ABBVIE Trinity BT Pharmaceutical Sligo

ABBVIE Trinity BT Pharmaceutical Sligo Project Overview Scope of Works: Cofferdams Drainage Ducting Client: John Paul Construction Sligo Ireland 6 Months March 2019 Project Gallery

Civil

HS2 Project M6 Loop

HS2 Project M6 Loop Project Overview Scope of Works: Drainage Ducting Watermain Slab Construction c500m2 series 700 (pavement) sub-base & 6f2 Client: PJ Hegarty &

Residential

St Marnocks Bay

St Marnocks Bay Project Overview Scope: Full Groundworks Package for over 153 units Excavation of Roads Capping and Sub-base Installation of in-situ kerbs approx.6 km

Commercial

Centre Parcs Longford Forest

Centre Parcs Longford Forest Project Overview Scope of Works: Installation of Mainline Storm Drainage Installation of Mainline Foul Drainage Installation of gas and Water from

Commercial

Janssen Cork

Jansen Cork Project Overview Scope of Works: Excavation for Pad Foundations Ducting Preparation for Floor Slabs Drainage Compound Works Client: Ringaskiddy, Co. Cork Ringaskiddy, Co.

Aviation

DAA North Runway Construction Package 2

DAA North Runway Construction Package 2 Project Overview Scope of Works: Installation of Concrete Pipe drainage depths 3-5m Installation of Runway drainage  Installation of Filter

Civil

Enniscorthy Bypass

Enniscorthy Bypass Project Overview Scope of Works: Carrier Drainage and Manholes Filter Drainage and catchpits Attenuation Ponds Pre-Earthworks drainage Client: BAM Ireland Enniscorthy, Wexford, Ireland

Civil

A361 Tiverton Link Road

A361 Tiverton Link Road Project Overview Scope of Works: Storm Drainage Client: Griffiths Tiverton, Devon, UK 40 Weeks August 2022 Project Gallery Latest Projects

Civil

Aberdeen Western Peripheral Road

Aberdeen Western Peripheral Road Project Overview Scope of Works: Carrier Drainage and Manholes Filter Drainage and catchpits Attenuation Ponds Pre-Earthworks drainage Concrete Roads Client: Galliford

Civil

A536 Congleton Link Road

A536 Congleton Link Road Project Overview Scope of Works: Mainline and Side Road Carrier Drainage Filter Drainage Side Road Drainage and Gully Install Pre-Earthworks Drainage

Civil

Units D,E,F Greenogue Industrial Park

Units D,E,F Greenogue Industrial Park Project Overview Scope Of Works: Drainage Foul and Storm Pad Foundations Stone to all floor slabs Kerbing Concrete to external

Aviation

Shannon Airport

Shannon Airport Project Overview Scope of Works: Ducting Duct Chambers Client: Shannon Airport Authority Shannon Ireland 8 Weeks Project Gallery Latest Projects

Civil

HS2 Kingsbury Compound

HS2 Kingsbury Compound Project Overview Project Scope: Drainage Ducting Watermain Cofferdams 6F2 Preparation for Blacktop Client: HS2 Project Kingsbury Compound HS2 Project Kingsbury Compound 30

Commercial

Intel

Intel Project Overview Scope of Works: Excavation for Pad Foundations Ducting Preparation for Floor Slabs Road Formation and Kerbing Deep Drainage storm water culverts 1200